4-stage natural gas compressor redesign
Scope
Full 3D redesign of process piping, lube-oil console, dry gas seal racks and acoustic hood.
- Flow
- 36,980 kg/h
- Pressure
- 13.21 to 50.8 bar(a)
- Codes
- API 617 · API 692 · B31.3
Industrial skid design for packaged equipment: 3D SolidWorks models, GA and fabrication drawings, welding and assembly drawings, piping isometrics and BOM schedules for skid-mounted packages. Work is delivered for fabricators, EPC contractors and OEMs across the UAE, the GCC and India, as a complete design package or as single deliverables that plug into your team’s workflow.
Each skid is designed with the workshop in mind. Base frames, drip trays and lifting lugs, valve and instrument access, centre of gravity and transport are checked in the model before drawings are issued, so fewer questions reach the shop floor.
Delivered as a complete design package or as single deliverables, in your title block and formats.
Applicable codes depend on the project specification and agreed scope; listing a code does not imply certification.
Projects delivered as lead/senior design engineer in previous roles.
Scope
Full 3D redesign of process piping, lube-oil console, dry gas seal racks and acoustic hood.
Scope
High-purity nitrogen unit with carbon molecular sieve towers, buffer vessels and valve skids.
Scope
Integration of Maser Italia fleet telemetry, explosion-proof dispensing and skid drip containment.
Seven stages from enquiry to documentation and handover.
Scope review and deliverables list
Fix codes, materials and design pressures
Footprint sizing and datasheet checks
Frame, piping routing, valve access and CoG checks in SolidWorks
GA, isometrics, weld details and cut lists
Answers to queries and concession reviews
As-built updates; FAT/SAT support with test protocols as agreed
Send your spec or tender and I reply within one working day. NDAs are available for confidential drawings.